BONDO, SIAYA COUNTY — What was meant to be a transformative road project in Bondo has spiralled into a full-blown crisis after more than 1,300 residents were left without clean drinking water, sparking protests and a hardline community ultimatum: no water, no road.
The construction of the Koyucho–Uloma–River Yala road by Tosh Holdings Ltd, under the Kenya Rural Roads Authority (KeRRA), has ruptured SIBOWASCO’s main water distribution pipeline in multiple sections, cutting off a critical lifeline to homes, schools, and businesses.
…CONTINUE READING
ADVERT